
Machine relocation
Assembly and dismantling of single machines and entire production lines – from the site survey to commissioning at the new location.
Quality and safety at a reasonable price
Relocating machines, and sometimes entire production lines, is a highly complex process that calls for technically demanding and precise operations. Dismantling requires experienced personnel and the right tools, and planning the optimal transport route is a real challenge.
Our internal procedures are designed to minimise risk at every stage – from planning, through packing and transport, to reassembly and start-up.
Request a quote
What we provide
Dismantling and assembly
Single machines and complete production lines.
Hermetic packing
Vacuum protection and transport crates for industrial machinery.
Road, air and sea transport
Route and mode of transport chosen to suit the size and value of the cargo.
Commissioning
Positioning, levelling and start-up of machines at the new location.
Stages of delivery
Survey and quote
We assess the scope of work and prepare an offer.
Dismantling
We disconnect and document installations and components.
Packing and transport
We secure the machines and deliver them to site.
Assembly and start-up
We position the machines and hand them over for production.
From our projects
Vacuum packing of machines and equipment
Complete machine relocation projects
Advanced relocation projects
Transport crates for industrial machinery
Frequently asked questions
How long does a production line relocation take?
It depends on the number of machines and the distance. After the survey we present a schedule that minimises production downtime.
Do you provide cargo insurance?
Yes, the cargo can be insured for the duration of transport. We agree the details in the offer.
